Saturday, October 18, 2008

Cruising Spots In Texas

progress in the enlargement of

are again been almost three weeks since my last entry. I focused this time completely on the extension part. Here is an intermediate state:

The track was gravel with gravel minitec "greywacke" actually in my eyes almost "Schwarzwacke. But after the patina does not the poor. The track gaps were filled with fine gravel as the gravel-yet imitation. The
I sanded after curing with a fine sandpaper, then he becomes even more uniform.



get the flanks of the rail sections I always paint in Revell rust. For Steel Mills typical patina I have stained the track area with dilute gray brown tinting.



The work of roads and storage areas will receive a concrete-gray paint, Patina will follow. There are currently stored there already first Styrodur pile.



Finally, three overview shots of today










0 comments:

Post a Comment