have in recent days I am working out the renovation of the D facilities building with ground work.
The transfer of road works on the water tower was lined with polystyrene sheets and filled the pages with still-gravel.
After painting it looks very good. The problem is the location of the water tower. An almost brainless idea, the road leading to just the point. How should I then bring the road surface, without to obstruct the operation of the switch, let me know at the moment a bit puzzling.
entirely unproblematic, however, the second transition.
The environment around the water tower is shaped. Here one can see the pretty rustic interior of the gas cleaning building.
0 comments:
Post a Comment