In the last two days the shell of the bridge crane is developed. Cornerstone is a well known kit - a huge thing. You can build the bridge crane by different combinations of the bridge girder segments of various lengths. My crane is the second-longest variant (about 70 cm long) was built.
affects the time of his black plastic still overwhelming. There are also missing the trolley as well as stairs and railings. But the moment I got fed up first, the assembly was not yet quite easily. Stairs and railings are in the kit the way, not in the Yanks crane operator must be good climbers.
While the individual components were still fit very well and I was really excited about this kit, I got some problems when joining the modules. The guide slots for connecting straps to the crane legs were sometimes very closely. Because not all the way I want, I realized, of course only when everything was smeared with glue nice and I tried to push the individual tabs in the slots. There was some violence really necessary and that for such sensitive parts! One reason is probably, in my opinion, that the mold maker has made just the connecting bridges to the molding of these tabs. After separation of the item I have tried these places but deburred, but 100% pure seems to me to be not successful. And
angle should then be ever so everything - in the meantime my hands so lacking 1-2. Was a bit annoying. Unfortunately went from not without structural defects, in spite of all corrective efforts.
But now is the thing and waiting for the further design - a horny part. So I had me the effect introduced in its place.
right of sidings is provided a piece of dock, there will probably create a Artitec-barge.
Finally, the current survey of the extension part. It goes on!
0 comments:
Post a Comment