Saturday, September 13, 2008

What Color Paint On Brazillian Cherry Wood Floor

remediation E-conditioning building (Intermediate level)

The S-system building was the first thing that came to my system, also my first work in terms of building it yourself.


At this time I had a few photos of the building. Actually, only views from a distance and a close-up of fairly oblique Perspective (you can see from the pictures on the dilution bottle).
So it surprised me not then, when I visit with my work but noted some differences.


So my pillar had fallen too delicate, but the window is too wide. The building is in much bulkier than my original model.



So I have the windows on each side each have a glass block reduced by polystyrene strips, and the pillars "cushioned". Still lacks the shine and when the ordered equipment has arrived, the design of the basement.





0 comments:

Post a Comment