Sunday, October 26, 2008

What Kind Of Weave Is Good??

redevelopment D facilities building

The basement was in the first version of the building, a closed, structured by vertical pillar block.
As expected, they were presented during the factory tour also some eye-opening experience. This made namely doors and windows!
part glass block, partly walled with different window inserts. The situation I have tried to recreate. Unfortunately, you could see and photograph only part.

has been set a new facade for the old. I imitate the glass blocks with Evergreen plates with quadatischer milling.
The windows were all in it yourself from Polysyrol Strip.


obtained the partition of cultivation, as at the rear of the building, a filling of masonry plate.



was then aged for the facade. This was the facade with a wetting agent from a spray bottle with diluted eingespüht and then black-brown color coated. Gently wipe off - it looks pretty good. In the basement were still moved a few pipes. Phew - for now achieved the goal.


On the back is also gone.


Pokemon Emerald Gameshark Clean Pockets

ground work

have in recent days I am working out the renovation of the D facilities building with ground work.

The transfer of road works on the water tower was lined with polystyrene sheets and filled the pages with still-gravel.


After painting it looks very good. The problem is the location of the water tower. An almost brainless idea, the road leading to just the point. How should I then bring the road surface, without to obstruct the operation of the switch, let me know at the moment a bit puzzling.



entirely unproblematic, however, the second transition.



The environment around the water tower is shaped. Here one can see the pretty rustic interior of the gas cleaning building.



Saturday, October 18, 2008

Cruising Spots In Texas

progress in the enlargement of

are again been almost three weeks since my last entry. I focused this time completely on the extension part. Here is an intermediate state:

The track was gravel with gravel minitec "greywacke" actually in my eyes almost "Schwarzwacke. But after the patina does not the poor. The track gaps were filled with fine gravel as the gravel-yet imitation. The
I sanded after curing with a fine sandpaper, then he becomes even more uniform.



get the flanks of the rail sections I always paint in Revell rust. For Steel Mills typical patina I have stained the track area with dilute gray brown tinting.



The work of roads and storage areas will receive a concrete-gray paint, Patina will follow. There are currently stored there already first Styrodur pile.



Finally, three overview shots of today