Tuesday, September 30, 2008

Spots On My Marble Dining Room Table

bridge crane - huge, but rather difficult terminated

In the last two days the shell of the bridge crane is developed. Cornerstone is a well known kit - a huge thing. You can build the bridge crane by different combinations of the bridge girder segments of various lengths. My crane is the second-longest variant (about 70 cm long) was built.
affects the time of his black plastic still overwhelming. There are also missing the trolley as well as stairs and railings. But the moment I got fed up first, the assembly was not yet quite easily. Stairs and railings are in the kit the way, not in the Yanks crane operator must be good climbers.



While the individual components were still fit very well and I was really excited about this kit, I got some problems when joining the modules. The guide slots for connecting straps to the crane legs were sometimes very closely. Because not all the way I want, I realized, of course only when everything was smeared with glue nice and I tried to push the individual tabs in the slots. There was some violence really necessary and that for such sensitive parts! One reason is probably, in my opinion, that the mold maker has made just the connecting bridges to the molding of these tabs. After separation of the item I have tried these places but deburred, but 100% pure seems to me to be not successful. And
angle should then be ever so everything - in the meantime my hands so lacking 1-2. Was a bit annoying. Unfortunately went from not without structural defects, in spite of all corrective efforts.



But now is the thing and waiting for the further design - a horny part. So I had me the effect introduced in its place.



right of sidings is provided a piece of dock, there will probably create a Artitec-barge.



Finally, the current survey of the extension part. It goes on!

Saturday, September 27, 2008

Dry Cough 5 Month Old

reference samples - or turn from the" true doctrine "

After days of intense Reference samples on the extension part, brainstorming new German am I now come to a result which will give me very much and realized already strong. However, I had to
me from my original plan, the sinter plant at least partially recreate adopt.
This has several reasons:

- have made with paper masks and plastic plates samples. Was much too cramped if I actually had completely sinter plant halfway to the plate, barely remained room for the crane runway. The up if they remember, I love this dirt pile. Runway show meant circumcise sintering plant. The Gasometer was also up - at some point I will draw a line drawn
- although I admit I did not take long, I've chosen a model where the railways play a very minor role. Since I now tentatively tried different track configurations and on the plant for almost a year and once again moved a routing unit, I realized that something little railroad. The DK also practiced in the delivery of the barge and in-house being transported by truck and train would be an interesting subject

So now the result of all Kopfzerchrechens: This part is designed to free impressions of the DK. It should also be more open than the blast furnace, where yes is built almost every cm ² of buildings and facilities.



obtain by the gasometer partially secured storage areas for various commodities, a quay in the background comes with "enormous" runway for the delivered materials as well as two loading tracks down.



The parts of the bush "concrete wall" to make himself better than me here. Such "partition" in the form of such prefabricated walls, there are heaps on the DK site. The old belt is used as Dummy for future pipe bridge between the gas cleaning and gas meters.



Styrodur upfront from the fortified storehouse, had yesterday and today, the joints and cracks engraved.



law comes out a piece of dock, the final position of the sidings is obtained if the bridge crane is assembled. I could not get past the Corner Stone-bridge crane, which is then the storage space for raw materials and coke span - a huge part.



Funny, it creates this building, for years, on my systems. These outbuildings are probably typical for various industries.



Wednesday, September 24, 2008

Abnormal Polarisation

Gasometer

I could not resist, the Gasometer from the Walthers Cornerstone Series was needed. The model comes in its execution and the dimensions of the DK-Gasometer pretty close. As a model quite a chunk. The kit was to install very well, unfortunately, had some of the filigree railing suffered. Currently, the model has received a first basic paint with a spray can, follow detailing and final color. Right now run intensive control samples whether the version shown is the final Standord, I do not know yet ... quite close to the tracks.










Saturday, September 13, 2008

What Color Paint On Brazillian Cherry Wood Floor

remediation E-conditioning building (Intermediate level)

The S-system building was the first thing that came to my system, also my first work in terms of building it yourself.


At this time I had a few photos of the building. Actually, only views from a distance and a close-up of fairly oblique Perspective (you can see from the pictures on the dilution bottle).
So it surprised me not then, when I visit with my work but noted some differences.


So my pillar had fallen too delicate, but the window is too wide. The building is in much bulkier than my original model.



So I have the windows on each side each have a glass block reduced by polystyrene strips, and the pillars "cushioned". Still lacks the shine and when the ordered equipment has arrived, the design of the basement.





How Much Is Weymouth Club Membership

extension

I simply had no desire for more "fiddly job, so I've made in recent days to the rough and built the extension plate. The result is now an L-shaped floor plan. The old legs to the blast furnace has to dimensions of 1.55 m x 1,10 m, the new leg is 1,50 m x 0,95 m. Part of this new surface is spent for gas and cleaning the water tower, is to come on the rest of the sinter plant. The original is indeed a different arrangement for blast furnaces, but otherwise it does not give her my space. Compromise, compromise ...


ranges also apparently "huge" area does not even begin to to replicate the entire sintering plant. Now I'm looking for the best cut.

Option 1: length on the new leg

would be satisfactory for the Siebhaus far right and the "T-house" on the cooling belts, and almost the entire main building (middle ) on the left image, even from the runway to the right of the screen then a beautiful piece goes on the plate. Immediately behind the back rail of the runway, the world would end

Option 2: Cross on the new leg

cross was only enough for Siebhaus, T-Home and cooling belts, on top of the main building then it would end, I might just have the front wall . indicate The runway is then only about 70 cm long, but I would get up with the gasometer, the border just after the Walthers model!