Monday, December 29, 2008

Apple Cider Vinegar And Hair Loss

casting machine and casting crane

Actually, I just wanted to make a few things in the molding machine so here

and devote myself then the gas cleaning, but it was then but a long aria, not to end.

I wanted to fit "just" the first new pillar of the right runway. adopted as the evil take its course. I had to realize that despite all the care the runway is not exactly parallel. At the end she spreads itself apart easily so it is my pillar just would not be vertical. And the casting crane above (built from a Walthers Heavy Duty Overhead Crane) fits just as well out, just because the runway is there aufspreizt! When I turned the runway into the correct position, the crane was just a little too wide. Now tell me the crane was anyway a while a thorn in the eye, was because the plastic parts of the crane bridge rather warped. Can you see below in the photo very well.


So, again model studies:



When I then remarked, that assembled the cab of the crane was the wrong way (the crane operator had its own crane in the back ?), Which was the death sentence for the crane.
saw the meantime, in this area like after a bomb attack:


Now I am building a new crane, the something is more heavy, and will simultaneously hold together the runway like a clamp.

Well, the drive of the casting machine and the vibrator I have made even further. In the next few days would then also have the right color to arrive, to finally eliminate the white.




Does Gameshark Work On Gpsphone

update on the water tower and the gas cleaning, or I'll inconsistent

Somehow I have the feeling of sheer Forums have neglected my own contributions to Traumfund. That should change.

This time we went to the gas cleaning:
http://www.qpic.ws/images/uM273011.jpg

is, however, it still here long road on the way:
http://www.qpic.ws/images/Bkg73193.jpg

Now I stood the entire time since my tour of the plant before the dilemma that the water tower and the Gasreinigungsgebä ; building in their rehabilitation were strongly changed.
My old photo sources all showed still the old, weathered concrete, plaster and beige box in the basement. Both have now changed. My gas cleaning was back then from parts of the Kibri Factory, the wall elements to the former appearance came pretty close. Now when I use the windows removed and smooth walls, I can immediately build a new building.
So after long discussions with myself, now there is a compromise - gray plaster, but keep the window!

the first floor the windows were "corrugated iron 'clad and the tanks got their pipes up.

http://www.qpic.ws/images/oD473702.jpg

The thick header received its conical shape at the end

http://www.qpic.ws/images/M6E73859.jpg

And then got the whole, his gray coat missed. When everything is dry, you continue on the patina. Then the other Arnaturen and the pipe bridge (already indicated times loosely) follow. How do I make the blue window frame, I must think it over.

http://www.qpic.ws/images/kMl73931.jpg

http://www.qpic.ws/images/wTq73972.jpg

I have to get used to themselves first turn!

Monday, December 1, 2008

Plantar Fasciitis Shoes

storage bins and "grubby corners


went in recent days, the area between Kokslager and gas meters. There should be bins arise in any case, I wanted to stand up there, yet a larger building - although the temptation was great, one or two workshops, etc. to squeeze there. But then would this plant leg just as we overload the the blast furnace.

So I made was a warehouse space with concrete enclosure, which was filled only a small part.
As usual, I built the floor from a hard foam plate in which the joints of the concrete slabs were engraved. The mount was made from 4mm polystyrene. In the photo this mount is much longer, they have to cut back soon, so that the whole area looks a bit more open.



The area between this camp and the troughs of the Kokslagers intended to fill a "grubby corner" I had seen during my visit in the background and depicted



course I had to limit myself to the essentials and my green waste dump would also be a "couple of sizes" of less be. The area was first sprinkled.



It looks like if every horizontal surface is covered in the room and has to serve the plant as a dry place.



rehearsal with "Bonsai" heap



The whole area done:



Behind the Gasometer, a small Schrottbansen arose.





views of the storage bins