In the last few days It moved on to several places in the cast house. At the discharge end was the "hood", under which the cars are cool with just the two of Gießbändern fallen, still hot pig iron with water. Although it is my Baukünste not exactly be described as a precision model making, I would they were a year or two, not thought to bring such a complicated structure but rather the first place.
Gießbänder the discharge end, behind the "hood" with the two left-looking hood hoppers. From there, at some point by pipe to a chimney.
From (the time for the works removed) runway on the pig iron bunker seen
have the runway of the cast house (currently without a roof), I completely built at the beginning of my project from modified parts of the Trix-converter building, since they its main dimensions are closely related to the (estimated by me!) original dimensions appeared. Today I met the different look and arrangement of the pillars of any more, some of them disturb the bwi other fixtures. So had now believe the foremost pillar nearby, and is replaced by a position and appearance vorbildgetreueres model.
to comparison here the original situation
behind the casting did these two scales, they are still detailed and weathered.
here is my example that I work around some quite radical with the already built a "must". The brown building was built by me as the foundry closed down block. In fact, there is but an open area with pillars, which is quite cluttered with pallets (see original image). I've tried
So, without further damage to this area with a jigsaw! to open. On the photo I've also just seen that the cut is not straight. Do I probably ran it again.
The staircase with its door openings while I have also subsequently cut or installed.
Originally, this area is not as high as my model. The building has the right floor height, the floor is unfortunately too low - that will keep me more often. But is absolutely not change.